Debrecen, Nagyerdő Project
Debrecen,
- 50 MW combined cycle gas turbine feasability study
E-ON Hungary,
Nyíregyháza,
- 50 MW gas turbine, organization of water preparation,
- mixed bed water technology design,
- installation of heat utilization boiler and of an auxiliary heating equipment
Százhalombatta, 50 MW combined cycle gas turbine
GDF-SUEZ,
Százhalombatta,
- 460 MW gas turbine auxiliary service electric energy supply, 2MW backup power supply establishment
- preparation of authorization documentation for a starting boiler room
Százhalombatta, 460MW gas turbine